BB-004 — DIY tinned-copper house-bank negative link

← Equipment Register · House distribution topology

Owner-confirmed functional topology, not a physical electrical test. The owner confirms the existing negative battery terminals connect directly to the battery-facing side of the Victron BMV-712 shunt through a DIY tinned-copper busbar/link designed previously. This is the house-bank negative interconnect, not the downstream load negative bus.

Identity and functional boundary

FieldDocumentation
Equipment referenceBB-004
ClassificationBusbar
LocationAt house battery negative terminals and shunt battery-side terminal
Source evidenceOwner’s 31 October 2026 description, previous engineering design records and relevant earlier source material
Survey verificationNo full current/continuity, physical switch/device label or installation measurements recorded

Connections and interfaces

RelationshipDocumented status
Battery interfaceEQ-059 aggregate house-bank negative port
Monitor interfaceBattery-side terminal of EQ-060 BMV shunt
Return segregationNo load or charger returns should connect on this battery side, as they would bypass the monitored current

Engineering and evidence notes

Earlier design notes describe approximately 25.4 × 3.2 mm tinned copper and bends accommodating terminal offset; these are historical design dimensions, not as-built measurements. The link’s actual section, hole clearances, insulation and rating need confirmation.

Keep distinct: House-bank internal composition and planned LiFePO4 replacement are outside this source-interface record. No proposed product, fuse size, cable gauge, or switching capacity should be labelled installed without independent evidence.

Outstanding survey

Photograph the fitted terminals and physical labels, identify any battery-side main protection, remote switch make/models and control/feed arrangements, conductor sizes, fuse identities, and the battery-shunt-system negative path. Identify actual source-to-panel termination and any manual disconnect procedure.